RailwayData | Bridges - ANI2 294/053 - Spey Viaduct

Spey Viaduct

Structure Overview

Asset Name: Spey Viaduct
Asset Type: Bridge (Viaduct)
Operational Status: Functionary
Lateral Position: Below track Major Structure: No

Location Details

ELR & Structure Ref: ANI2 294/053
Railway Location: 22m 65ch / 22m 1425yds
Railway Location (rounded): 22.81m / 36.71Km
OS Location Ref: NJ3182951806
Territory: Scotland (Scotland East)
Route Type: Secondary

Contruction Details

Primary Material: RBE - Early Steel
Structural Form: Beam
Listed Structure: YES

Ownership & Maintainance Details

Structure Owner: Network Rail (CE-Struct)
Cost Recoverable: No- - -Annual Maint. Charge: No

Individual Components

MilesCH.YardsKmAssetNameStatus
22.8165142536.71SpanSpey Viaduct - Span 1 of 8Functionary
22.8165142536.71SpanSpey Viaduct - Span 2 of 8Functionary
22.8165142536.71SpanSpey Viaduct - Span 3 of 8Functionary
22.8165142536.71SpanSpey Viaduct - Span 4 of 8Functionary
22.8165142536.71SpanSpey Viaduct - Span 5 of 8Functionary
22.8165142536.71SpanSpey Viaduct - Span 6 of 8Functionary
22.8165142536.71SpanSpey Viaduct - Span 7 of 8Functionary
22.8165142536.71SpanSpey Viaduct - Span 8 of 8Functionary

SCMI Ratings and Inspection Details

Every 6 years, Network Rail carry out detailed inspections on all their structures, which in most cases includes the calculation of an SCMI (or Structures Condition Marking Index). An SCMI score is a number between 0 and 100 and is used to grade the condition of a structure or how close it is to life-expiration. These figures are derived from a 2015 dataset and may not represent the present structure condition.

SCMI Score: 55- - -Bridge Condition Grade: 3- - -Inspection Date: 09/2016
55/100
As a (very) rough guide, a score below 40 is considered in poor condition, with a score above 80 in excellent condition.
The chart below shows SCMI scores and their equivalent Bridge Condition Grades (BCG).
SCMI: 80+
BCG: 1
SCMI: 60 - 79
BCG: 2
SCMI: 40 - 59
BCG: 3
SCMI: 20 - 39
BCG: 4
SCMI: -19
BCG: 5