RailwayData | Bridges - CGJ5 120 - Ribble Viaduct-river Ribble (main Lines)

RIBBLE VIADUCT-RIVER RIBBLE (MAIN LINES)

Structure Overview

Asset Name: Ribble Viaduct-river Ribble (main Lines)
Asset Type: Bridge (Viaduct)
Operational Status: Functionary
Major Structure: No

Location Details

ELR & Structure Ref: CGJ5 120
Railway Location: 21m 22ch / 21m 0484yds
Railway Location (rounded): 21.28m / 34.24Km
OS Location Ref: SD535283
Territory: London North Western (Lancs & Cumbria)

Contruction Details

Primary Material: RBE - Stone
Structural Form: Arch
Listed Structure: No

Ownership & Maintainance Details

Structure Owner: Network Rail (CE-Struct)
Cost Recoverable: No- - -Annual Maint. Charge: No

Individual Components

MilesCH.YardsKmAssetNameStatus
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (GOODS LINES) - Span 1 of 5Functionary
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (GOODS LINES) - Span 2 of 5Functionary
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (GOODS LINES) - Span 3 of 5Functionary
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (GOODS LINES) - Span 4 of 5Functionary
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (GOODS LINES) - Span 5 of 5Functionary
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (MAIN LINES) - Span 1 of 5Functionary
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (MAIN LINES) - Span 2 of 5Functionary
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (MAIN LINES) - Span 3 of 5Functionary
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (MAIN LINES) - Span 4 of 5Functionary
21.2822048434.24SpanRIBBLE VIADUCT-RIVER RIBBLE (MAIN LINES) - Span 5 of 5Functionary

SCMI Ratings and Inspection Details

Every 6 years, Network Rail carry out detailed inspections on all their structures, which in most cases includes the calculation of an SCMI (or Structures Condition Marking Index). An SCMI score is a number between 0 and 100 and is used to grade the condition of a structure or how close it is to life-expiration. These figures are derived from a 2015 dataset and may not represent the present structure condition.

SCMI Score: 76- - -Bridge Condition Grade: 2- - -Inspection Date: 10/2014
76/100
As a (very) rough guide, a score below 40 is considered in poor condition, with a score above 80 in excellent condition.
The chart below shows SCMI scores and their equivalent Bridge Condition Grades (BCG).
SCMI: 80+
BCG: 1
SCMI: 60 - 79
BCG: 2
SCMI: 40 - 59
BCG: 3
SCMI: 20 - 39
BCG: 4
SCMI: -19
BCG: 5