RailwayData | Bridges - SAC 326 - Dry Beck Viaduct

DRY BECK VIADUCT

Structure Overview

Asset Name: Dry Beck Viaduct
Asset Type: Bridge (Viaduct)
Operational Status: Functionary

Location Details

ELR & Structure Ref: SAC 326
Railway Location: 299m 6ch / 299m 0132yds
Railway Location (rounded): 299.08m / 481.31Km
OS Location Ref: NY508478
Territory: London North Western (Lancs & Cumbria)

Contruction Details

Primary Material: RBE - Stone
Secondary Material: RBE - Brick
Structural Form: Arch
Listed Structure: YES

Ownership & Maintainance Details

Structure Owner: Network Rail (CE-Struct)
Cost Recoverable: No- - -Annual Maint. Charge: No

Individual Components

MilesCH.YardsKmAssetNameStatus
299.0860132481.31SpanDRY BECK - Span 1 of 7Functionary
299.0860132481.31SpanDRY BECK - Span 2 of 7Functionary
299.0860132481.31SpanDRY BECK - Span 3 of 7Functionary
299.0860132481.31SpanDRY BECK - Span 4 of 7 DRY BECKFunctionary
299.0860132481.31SpanDRY BECK - Span 5 of 7Functionary
299.0860132481.31SpanDRY BECK - Span 6 of 7Functionary
299.0860132481.31SpanDRY BECK - Span 7 of 7Functionary

SCMI Ratings and Inspection Details

Every 6 years, Network Rail carry out detailed inspections on all their structures, which in most cases includes the calculation of an SCMI (or Structures Condition Marking Index). An SCMI score is a number between 0 and 100 and is used to grade the condition of a structure or how close it is to life-expiration. These figures are derived from a 2015 dataset and may not represent the present structure condition.

SCMI Score: 82- - -Bridge Condition Grade: 1- - -Inspection Date: 05/2018
82/100
As a (very) rough guide, a score below 40 is considered in poor condition, with a score above 80 in excellent condition.
The chart below shows SCMI scores and their equivalent Bridge Condition Grades (BCG).
SCMI: 80+
BCG: 1
SCMI: 60 - 79
BCG: 2
SCMI: 40 - 59
BCG: 3
SCMI: 20 - 39
BCG: 4
SCMI: -19
BCG: 5