RailwayData | Bridges - FSS1 28 - Blackwall Tunnel Approach (lul D139)

BLACKWALL TUNNEL APPROACH (LUL D139)

Structure Overview

Asset Name: Blackwall Tunnel Approach (lul D139)
Asset Type: Bridge (Overline Bridge)
Operational Status: Functionary

Location Details

ELR & Structure Ref: FSS1 28
Railway Location: 3m 22ch / 3m 0484yds
Railway Location (rounded): 3.28m / 5.27Km
Territory: Anglia (Romford)

Contruction Details

Primary Material: RBE - Pre-tensioned Concrete
Listed Structure: No- - -No. of Components: 1

Ownership & Maintainance Details

Structure Owner: Outside Party
Outside Party: Transport for London
Party Paying Maintainance: Outside Party
Cost Recoverable: YES- - -Annual Maint. Charge: No

Individual Components

MilesCH.YardsKmAssetNameStatus
3.282204845.27SpanBLACKWALL TUNNEL APPROACH - Span 1Functionary

SCMI Ratings and Inspection Details

Every 6 years, Network Rail carry out detailed inspections on all their structures, which in most cases includes the calculation of an SCMI (or Structures Condition Marking Index). An SCMI score is a number between 0 and 100 and is used to grade the condition of a structure or how close it is to life-expiration. These figures are derived from a 2015 dataset and may not represent the present structure condition.

SCMI Score: 85- - -Bridge Condition Grade: 1- - -Inspection Date: 02/09/2012
85/100
As a (very) rough guide, a score below 40 is considered in poor condition, with a score above 80 in excellent condition.
The chart below shows SCMI scores and their equivalent Bridge Condition Grades (BCG).
SCMI: 80+
BCG: 1
SCMI: 60 - 79
BCG: 2
SCMI: 40 - 59
BCG: 3
SCMI: 20 - 39
BCG: 4
SCMI: -19
BCG: 5