RailwayData | Bridges - FSS1 521 - Martineau Street (arch No.172) (dlr Shav1720)

MARTINEAU STREET (ARCH NO.172) (DLR SHAV1720)

Structure Overview

Asset Name: Martineau Street (arch No.172) (dlr Shav1720)
Asset Type: Bridge (Underline Bridge)
Operational Status: Functionary

Location Details

ELR & Structure Ref: FSS1 521
Railway Location: 1m 17ch / 1m 0374yds
Railway Location (rounded): 1.21m / 1.95Km
OS Location Ref: TQ 353 810
Territory: Anglia (Romford)

Contruction Details

Primary Material: RBE - Brick
Listed Structure: No- - -No. of Components: 1

Ownership & Maintainance Details

Structure Owner: Network Rail (CE-Struct)
Outside Party: DLR
Party Paying Maintainance: Network Rail/Outside Party
Cost Recoverable: No- - -Annual Maint. Charge: No

Individual Components

MilesCH.YardsKmAssetNameStatus
1.211703741.95SpanMARTINEAU STREET (ARCH NO.172) - Span 1Functionary

SCMI Ratings and Inspection Details

Every 6 years, Network Rail carry out detailed inspections on all their structures, which in most cases includes the calculation of an SCMI (or Structures Condition Marking Index). An SCMI score is a number between 0 and 100 and is used to grade the condition of a structure or how close it is to life-expiration. These figures are derived from a 2015 dataset and may not represent the present structure condition.

SCMI Score: 87- - -Bridge Condition Grade: 1- - -Inspection Date: 01/05/2003
87/100
As a (very) rough guide, a score below 40 is considered in poor condition, with a score above 80 in excellent condition.
The chart below shows SCMI scores and their equivalent Bridge Condition Grades (BCG).
SCMI: 80+
BCG: 1
SCMI: 60 - 79
BCG: 2
SCMI: 40 - 59
BCG: 3
SCMI: 20 - 39
BCG: 4
SCMI: -19
BCG: 5