RailwayData | Bridges - FSS1 7-14 - Fenchurch Street - Bow Triangle Viaduct Arches 7 - 14

FENCHURCH STREET - BOW TRIANGLE VIADUCT Arches 7 - 14

Structure Overview

Asset Name: Fenchurch Street - Bow Triangle Viaduct Arches 7 - 14
Asset Type: Bridge (Viaduct)
Operational Status: Functionary

Location Details

ELR & Structure Ref: FSS1 7-14
Railway Location: 2m 71ch / 2m 1562yds
Railway Location (rounded): 2.89m / 4.65Km
Territory: Anglia (Romford)
Route Type: L&SE

Contruction Details

Primary Material: RBE - Brick
Structural Form: Arch
Listed Structure: No

Ownership & Maintainance Details

Structure Owner: Network Rail (CE-Struct)
Cost Recoverable: No- - -Annual Maint. Charge: No

Individual Components

MilesCH.YardsKmAssetNameStatus
2.917315964.68SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 10Functionary
2.917316024.68SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 11Functionary
2.917316084.69SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 12Functionary
2.927316144.69SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 13Functionary
2.927416204.70SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 14Functionary
2.947616614.74SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 16Functionary
2.947616614.74SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 17Functionary
2.947616614.74SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 17Removed
2.957616784.75SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 18Functionary
2.957616784.75SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 18Removed
2.897115624.65SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 7Functionary
2.907215904.67SpanFENCHURCH STREET - BOW TRIANGLE VIADUCT Arch 9Functionary

SCMI Ratings and Inspection Details

Every 6 years, Network Rail carry out detailed inspections on all their structures, which in most cases includes the calculation of an SCMI (or Structures Condition Marking Index). An SCMI score is a number between 0 and 100 and is used to grade the condition of a structure or how close it is to life-expiration. These figures are derived from a 2015 dataset and may not represent the present structure condition.

SCMI Score: 70- - -Bridge Condition Grade: 2- - -Inspection Date: 09/2012
70/100
As a (very) rough guide, a score below 40 is considered in poor condition, with a score above 80 in excellent condition.
The chart below shows SCMI scores and their equivalent Bridge Condition Grades (BCG).
SCMI: 80+
BCG: 1
SCMI: 60 - 79
BCG: 2
SCMI: 40 - 59
BCG: 3
SCMI: 20 - 39
BCG: 4
SCMI: -19
BCG: 5