RailwayData | Bridges - MAC3 219S - Subway South Of Bridge 219 Formerly 218

SUBWAY SOUTH OF BRIDGE 219 FORMERLY 218

Structure Overview

Asset Name: Subway South Of Bridge 219 Formerly 218
Asset Type: Bridge (Underline Bridge)
Operational Status: Functionary

Location Details

ELR & Structure Ref: MAC3 219S
Railway Location: 74m 58ch / 74m 1265yds
Railway Location (rounded): 74.72m / 120.25Km
OS Location Ref: SK818901
Territory: London North Eastern (Sheffield)

Contruction Details

Primary Material: RBE - Cast in-situ reinforced Concrete
Construction Details: Reinforced Concrete
Listed Structure: No- - -No. of Components: 1

Ownership & Maintainance Details

Structure Owner: Network Rail (CE-Struct)
Party Paying Maintainance: Network Rail

Individual Components

MilesCH.YardsKmAssetNameStatus
74.72581265120.25SpanSUBWAY SOUTH OF BRIDGE 219 FORMERLY 218 - SPAN 1 of 1Functionary

SCMI Ratings and Inspection Details

Every 6 years, Network Rail carry out detailed inspections on all their structures, which in most cases includes the calculation of an SCMI (or Structures Condition Marking Index). An SCMI score is a number between 0 and 100 and is used to grade the condition of a structure or how close it is to life-expiration. These figures are derived from a 2015 dataset and may not represent the present structure condition.

SCMI Score: 81- - -Bridge Condition Grade: 1- - -Inspection Date: 16/08/2005
81/100
As a (very) rough guide, a score below 40 is considered in poor condition, with a score above 80 in excellent condition.
The chart below shows SCMI scores and their equivalent Bridge Condition Grades (BCG).
SCMI: 80+
BCG: 1
SCMI: 60 - 79
BCG: 2
SCMI: 40 - 59
BCG: 3
SCMI: 20 - 39
BCG: 4
SCMI: -19
BCG: 5