RailwayData | Level Crossing - Hardwick No.2 [HSA]

Hardwick No.2

Crossing Overview

Asset Name: Hardwick No.2 . . . Asset Type: Level Crossing
Sub-type: Public Footpath Crossing

Inspection Details

Last Inspection: January 2019
Line Speed: 60 mph. . .Type of Trains: Passenger & Freight
Predicted Usage: 1 Pedestrian or Cyclist
Trains Per Day (approx.): 83
Key Risks:
- - -* Frequent Trains
Protection Arrangements:
- - -* Signage
- - -* Gates or stiles

Individual Risk:C - - - Collective Risk:8
what does this mean?

Location Details

ELR: HSA
Railway Location:
012m 37ch. / 012m 0808yds.
Railway Location (rounded):
12.46 miles / 20.05Km
District: Stratford-on-Avon District