RailwayData | Level Crossing - Brigg [MAC3]

Brigg

Crossing Overview

Asset Name: Brigg . . . Asset Type: Level Crossing
Sub-type: Public Highway Manually Controlled Barriers

Inspection Details

Last Inspection: June 2020
Line Speed: 40 mph. . .Type of Trains: Passenger & Freight
Predicted Usage: 9059 Vehicles 473 Pedestrians or Cyclists
Trains Per Day (approx.): 23
Key Risks:
- - -* Large Numbers of Users
Protection Arrangements:
- - -* Train signalling protection
- - -* Controlled by Signaller
- - -* Road traffic light signals
- - -* Full barrier equipment
- - -* Audible alarm
- - -* Signage

Individual Risk:J - - - Collective Risk:4
what does this mean?

Location Details

ELR: MAC3
Railway Location:
091m 25ch. / 091m 0540yds.
Railway Location (rounded):
91.31 miles / 146.94Km
District: Brigg CP