RailwayData | Cliftonville Tunnel [PPH]

Cliftonville Tunnel

ELR: PPH - - Structure Ref: 1133
Start Location: 49m 56ch / 49m 1221yds
Finish Location: 49m 80ch / 49m 1756yds
Start Loc (rounded): 49.69m / 79.97Km
Finish Loc (rounded): 50.00m / 80.46Km
Total Length: 0m 24ch / 0.30m / 0.49Km
Region: Brighton
Territory: Sussex
Operational Status: Functionary


Individual assets

MilesCH.YardsKmAssetNameStatus
49.6956122179.97Components1' 2" Drainage Culvert At Tunnel Invert Level - CliftonvilleRemoved
49.6956122179.97PortalCliftonville Tunnel London End Portal (SR)Functionary
50.0080175680.46PortalCliftonville Tunnel Country End Portal (SR)Functionary